Battery parameter setting management

by:Power Kingdom     2021-07-11

  Battery parameter setting management:

  Floating charging voltage: 2.23-2.25V/single (25℃)

  24V system: 26.76-27.0V 48V system: 53.52-54.0V

   Floating charge voltage temperature compensation coefficient: -3.0mV/℃ (reference temperature is 25℃)

  Uniform charging voltage: 2.35V/cell (25℃)

  24V system: 28.2V48V system: 56.4V

   Constant charge voltage temperature compensation coefficient: -5.0mV/℃ (reference temperature is 25℃)

   average charge Frequency: 6 months/time (180 days)-special circumstances

   Average filling time: 12 hours, average current limit: 0.1-0.25C10.

  High voltage alarm: 24V system: 28.5V48V system: 57V

   Low voltage alarm: 24V system: 23.4V48V system: 47V

   Switching voltage: 24V system: 22.2V 48V system: no setting (depending on the situation)

   unified floating mortgage conversion Standard:

   1. The ratio of charge and discharge capacity to capacity is 95%/2, the discharge time is greater than 30 minutes, the discharge voltage is less than 49V, and the discharge voltage is less than 49V.

  Floating charging standard: 1. Steady current and equalizing charging time: 180min; Steady current and equalizing charging current: ≤006C10/group daily maintenance and management

  Monthly check battery items: single battery floating voltage, battery total pressure and load current; battery appearance; battery rod and safety valve leakage or acid mist; battery ambient temperature and environmental conditions.

  -Required equipment: digital multimeter, clamp ammeter, thermometer.

  Note: If conditions permit, the internal resistance of the battery can be measured with the required internal resistance meter: the internal resistance meter is checked every six months:

< /p>

   Tighten the connecting screws and charge for 12 hours.

  Required equipment: wrench (or set of brass wrenches)

  Check the battery every year:

   conducted a 30-40% C10 nuclear discharge test on the battery pack.

  GB/T1497-1988 Feeder busbar, cable and connector voltage drop measurement method

  -Required equipment: Digital multimeter, clamp meter, thermometer, dummy load, cable, etc.

  Inspect items every three years:

   The battery pack has been subjected to a discharge test of 80% C10 capacity.

  Contact: Power Kingdom

  


Shenzhen Power Kingdom Co., Ltd. devises a regular, independent, transparent and objective assessment mechanism to evaluate country performance.
For more information on this topic and others, please visit Power Kingdom. We are among the top manufacturers of sealed lead acid battery top lead acid battery manufacturers in China, and we serve big names in sealed lead acid battery industry. You can rely on us for our high quality . Send your enquiry!
For Shenzhen Power Kingdom Co., Ltd. as a whole to adopt an attitude of acceptance toward change and technological innovation, we first have to truly embrace it and practice what they preach. Technological development needs to be more than just another investment, but a complete integration.
Power Kingdom provides a number of top lead acid battery manufacturers designed to handle top lead acid battery manufacturers.
Custom message
Chat Online 编辑模式下无法使用
Leave Your Message inputting...